What Breaking Bad Taught Me about Availability Planning

Two of the dilemmas for Walt in Breaking Bad are scale and availability planning.

Walt knows that with Jesse, his partner, they cannot reach their financial targets by selling locally (scale). Getting specific ingredients on a regular basis is also difficult, as they cannot deliver their product on schedule.

Download Now for $9.99 – Buy Here!

Download Templates Here

[Learn more about this Availability Plan template]

Availability Planning in Breaking Bad

After a few false starts – Tuco, for example – they team up with Gustavo Fring, an experienced businessman who runs his illegal drug activities with the same planning and organization as his other businesses.

Gustavo offers Walt scale, distribution, and facilities.

But he also expects the product – meth in this case – to be developed and ready on time. In Breaking Bad, the availability plan is one component of a much larger project plan.

Gustavo, who seems to understands the principles of ITIL IT service management, probably prepared some of the following:

  1. Availability requirements
  2. Estimated future availability needs in the short to medium term.
  3. Steps to keep the service operating if technical failures occur.
  4. Disaster recovery planning.
  5. Performed periodic diagnostics on systems availability.
  6. Evaluated service capacity of suppliers.
  7. Monitored IT service availability.
  8. Prepared progress reports based on availability, reliability, maintainability and fulfilment.
  9. Evaluated the impact of security policies on availability.
  10. Advised Change Management about impacts of a change on availability.

Download Now for only $19.99

Disaster Recover Plan Sample Template

[Learn more about these Disaster Recovery templates]

Use this Disaster Recovery Plan to achieve the following:

It’s interesting to watch well-researched shows like Breaking Bad as part of what makes them compelling is the attention to detail.

Gustavo is believable because he’s consistent.

His attention to detail is what sets him apart from rival producers. He also has a real business brain. You just know he’s well able to crunch numbers on a spreadsheet. And you can also see why Walt White wants to work with him. Good planning instils confidence.

Summary

Developing an availability plan isn’t complicated.

  • Outline the availability status of IT services.
  • Update the information periodically.
  • Identify tools for monitoring availability.
  • Apply analysis methods and techniques.
  • Setup metrics and benchmarks.
  • Establish expectations about future availability.

It’s like insurance when things to wrong. It some ways it’s the flip side of a business continuity plan.

PS – I’m only on Series 3 so it will be interesting to see what happens when the unexpected happens – and see who has the best contingency plan!

Thousands of templates to jump start your project

Acceptance Test Plan

Contingency Plan

Software Development Templates

Acquisition Plan

Conversion Plan

Software Requirements Specification

Action Plan

Cost Benefit Analysis

Software Testing

API Documentation

Database Design

Standard Operating Procedures (SOP)

Audience Analysis

Datasheet

Statement of Work

Availability Plan

Deployment Plan

System Administration Guide

Bill of Materials

Design Document

System Boundary

Business Case

Disaster Recovery Plan

System Design Document

Business Continuity

Disposition Plan

System Specifications

Business Plan

Documentation Plan

Technical Writing Templates

Business Process

Employee Handbook

Test Plan

Business Requirements

Error Message Guide

Training Plan

Business Rules

Expression of Interest

Transition Plan

Capacity Plan

Fact Sheet

Troubleshooting Guide

Case Study

Feasibility Study

Use Case

Change Management Plan

Functional Requirements

User Guide

Communication Plan

Grant Proposal

Verification and Validation Plan

Concept of Operations

Implementation Plan

White Papers

Concept Proposal

Installation Plan

Work Instructions

Configuration Management Plan

Interface Control Document

Software Development Templates

Acceptance Test Plan

Maintenance Plan

Software Requirements Specification

Acquisition Plan

Market Research

Software Testing

Action Plan

Marketing Plan

Standard Operating Procedures (SOP)

API Documentation

Needs Statement

Statement of Work

Audience Analysis

Operations Guide

System Administration Guide

Availability Plan

Policy Manual

System Boundary

Bill of Materials

Project Plan

System Design Document

Business Case

Proposal Manager Templates

System Specifications

Business Continuity

Proposal Template

Technical Writing Templates

Business Plan

Quality Assurance Plan

Test Plan

Business Process

Release Notes

Training Plan

Business Requirements

Request for Proposal

Transition Plan

Business Rules

Risk Management Plan

Troubleshooting Guide

Capacity Plan

Scope of Work

Use Case

Case Study

Security Plan

User Guide

Change Management Plan

Service Level Agreement (SLA)

Verification and Validation Plan

Communication Plan

Setup Guide

White Papers

Concept of Operations

Social Media Policy

Work Instructions

Concept Proposal

Contingency Plan

 

Configuration Management Plan

Conversion Plan